Book a demo

Members get the incident lessons. Students get the public record.

An AI knowledge assistant for process safety associations. Every answer is cited to the page, and drawn only from the tiers each member holds.

30 minutes, on your own documents.

Question: What were the root causes of the Texas City explosion?

asked by all three
Maren Holt, Process safety engineer, Corporate

The CSB traced the March 2005 explosion, 15 killed and 180 injured citation 1, to failures at three levels:

Board
The Group Board “did not provide effective oversight” of safety culture citation 2
Site
No reporting and learning culture; procedures were not enforced citation 2
Unit
No flare on the blowdown system; no automated high-level controls citation 3
CSB report page 210, root causes, with the cited sentence highlighted
2 · p.210
CSB 2005-04-I-TXp.17p.210p.211
3 tiers searched · 3 pages citedCited
Luis Arce, Plant operations supervisor, Member

The CSB traced the March 2005 explosion, 15 killed and 180 injured citation 1, to failures at three levels:

Board
The Group Board “did not provide effective oversight” of safety culture citation 2
Site
No reporting and learning culture; procedures were not enforced citation 2
Unit
No flare on the blowdown system; no automated high-level controls citation 3
CSB report page 210, root causes, with the cited sentence highlighted
2 · p.210
CSB 2005-04-I-TXp.17p.210p.211
2 tiers searched · 3 pages citedCited
Jordan Pike, Engineering student, Public
Not in your accessThe CSB final reports are Member content.
Request access

From the public recordThe CSB investigated the March 23, 2005 explosion at BP Texas City: 15 killed, 180 injured. Its root-cause findings sit in the final report.

Member content · p.210
1 tier searched · 0 report pages cited
Examples are built on public documents; access tiers are simulated.PublicMemberCorporate

Each report sits in the ring its members pay for.

Part 68 lives on the Corporate ring, so a member’s answer never quotes it.

Ask “What were the root causes of the Texas City explosion?” as

Corporate · locked for LuisMemberPublic
29 CFR 1910.11929 CFR 1910.119
OSHA 3132OSHA 3132
CSB report, BP Texas CityCSB · Texas City
CSB report, T2 LaboratoriesCSB · T2
CSB report, West FertilizerCSB · West
CSB report, PES refineryCSB · PES
40 CFR Part 68, locked
Searched 2 tiers · 6 documents
Luis ArceStrong match

The CSB traced the March 2005 explosion, 15 killed and 180 injured citation 1, to failures at three levels:

Board
The Group Board “did not provide effective oversight” of safety culture citation 2
Site
No reporting and learning culture; procedures were not enforced citation 2
Unit
No flare on the blowdown system; no automated high-level controls citation 3
CSB 2005-04-I-TXp.17p.210p.211
2 tiers searched · 3 pages cited · Part 68 never opened

Every line of the answer opens on its page.

Ask about Texas City. Each claim points to the sentence in the CSB report, highlighted.

CSB 2005-04-I-TX · Refinery Explosion and Fire, BP Texas City

1.0 Executive summaryp.17
CSB report page 17, executive summary, with the sentences on the deaths and injuries highlighted

The CSB traced the March 2005 explosion, 15 killed and 180 injured

12.1 Root causesp.210
CSB report page 210, root causes, with the Board finding highlighted
Board
The Group Board “did not provide effective oversight” of safety culture
Site
No reporting and learning culture; procedures were not enforced
12.1 Root causes, continuedp.211
CSB report page 211, root causes continued, with the missing flare and automated controls highlighted
Unit
No flare on the blowdown system; no automated high-level controls

Change reviews, drafted and held.

And no numbers your library doesn’t hold.

MOC-2026-0142 · Relief valve PSV-3107 review

Nothing is written until Tomasz Brandt, PSM manager, approves it.

  1. Done: Requested
  2. Done: Dry run
  3. Now: Approving
  4. Next: Approved
  5. Next: Record created
moc.open_reviewHarrow Bend MOC registerMOC-2026-0142
titleNew relief valve PSV-3107 on drum D-310
technical_basisRelief load for revised feed rate(l)(2)(i)
safety_health_impactRevalidate PHA node 4(l)(2)(ii)
procedure_changesSOP-D310-02, revision C(l)(2)(iii)
time_periodPermanent(l)(2)(iv)
authorizationTomasz Brandt, PSM manager(l)(2)(v)
Approve and runReject5 of 5 MOC considerations

“What’s the safe operating limit for our reactor R-101?”

Rule P-02: refuse, and point to the plant’s own process safety information.

“I can only answer from the Process Safety Library materials, and they don’t cover that.”
  • Reactor R-101Harrow Bend Chemical
  • Your PSISafe upper and lower limits1910.119(d)(2)(i)(D)
  • Operating procedureOperating limits1910.119(f)(1)(ii)

0 passages on R-101 · 0 numbers made

30 minutes, on your own documents.

We map your tiers to rings and ask one question as three of your members.